How we work
What gets written down, who you talk to, and what happens after the work is in use.
Consulting, custom software, managed hosting, and ongoing support follow the same shape. The capabilities statement lists the work and the company facts. This page is how an engagement is run.
The first conversation
Write to [email protected], or use the contact form. Say what you need, what already exists, and any deadline or budget you know. A range is enough. You can start before the specification is finished.
The reply comes from someone who would do the work. If the work is not a fit, we say so. If it is, the next thing written is a scope.
What we need from you
Bring these, and a scope can be written.
- A decision
- One person who can say yes, no, and what changed.
- Current state
- The systems, vendors, files, or artwork the work has to live with.
- Constraints
- A deadline, a budget range, and what must not change. An unknown is fine when it is named as an unknown.
- Access
- When the work needs it: an account, a sample, or a person who can grant them.
-
Scope
We count the cost before anything is built. What gets agreed is short and specific.
- In
- The work that will be done.
- Out
- What sits beside it and is left out.
- Done
- What you will have, and how you will know it is finished.
- Change
- Who can widen the work. A change is written down before the work follows it.
A scope that is still a feeling does not start.
-
Build
One team does the work. The people who write the scope are the people who design it, make it, and answer for it. On a software job, that is the person building it.
You are not passed from a seller to a crew you have not met.
-
Status
You hear how it is going while it is underway, in writing. A status says what changed, what is next, what is blocked, and what we are waiting on from you.
Questions go back to the people doing the work. When the work is finished, the record comes with it: how it runs, how to change it, and where it lives. Finished software includes the notes required to operate it.
-
Stay
We stay until the work holds.
- With us
- If the system stays with us, monitoring and routine maintenance stay with the people who built it.
- With you
- If it goes to you, you get what you need to run it, and a way back when it needs work again.
- Next
- The next change, if there is one, is scoped the same way: written, agreed, then made.
The same shape
Four kinds of work, one way of running them. What each service is lives on the capabilities statement.
- Consulting
- The written result is a plan: what to keep, what to change, and what is not worth doing. Carrying the plan out, if you want that, starts with its own scope.
- Custom software
- Scope names the system, what it must talk to, and what done means. Status is written progress. Fixes and the next change stay on this model.
- Managed hosting
- Scope names what is hosted and what counts as up. The people who know the system are the ones who watch it.
- Ongoing support
- There is no separate launch. The scope is the standing arrangement: what is covered, how you ask, and how you hear what was done.
Signage
projectseven also makes signs. That job sits apart from the engagement above.
Nameplates, safety and wayfinding signs, plaques, and marked parts. We design or lay them out with you, fabricate them, and deliver them with the file.
A small roster
The roster stays small so the same people can stay on the work. projectseven takes a limited number of engagements at once. A request that does not fit gets a later date or a no. You reach the people doing the work.
What we will not do
- Start work that cannot be written down.
- Win the conversation with one person and staff it with another.
- Leave after launch with a login and nobody who knows the system.
- Stretch a small job into a program. A fix and a system can share this model. They do not need the same amount of paper.
Start a conversation.
Tell us what you are building, running, or fixing. Email [email protected] or use the contact form.